We use cookies to make our website more useful to you OK
FRYTR2S/460
2 Mtr x 460 mm carabiner end suspension system (SWL 50kg)
< BACKROPE ASSEMBLY SYSTEM ZIP-CLIP  >  SUSPENSION SYSTEMS WITH CARABINE
2 Mtr x 460 mm carabiner end suspension system (SWL 50kg)
Product appearance may be different from picture
PRICE
€ 9.027 / pcs
€ 7.46 / pcs
inc. VAT excl. VAT
Not available
Article:FRYTR2S/460Copy
Manufacturer:Zip- Clip
Web:zip-clip.com/product...
Specifications, Certificates and declarations
Only for registered users
Options
CountryFRANCIJA
Lifting capacity50 kg
Length2 m
SeriesYITTRS
Description

THE Y-IT SYSTEM is designed to turn one suspension point in the ceiling into two connection points at service level. The system incorporates an inverted Y-Shape design with equal leg lengths to ensure services are level once installed. APPLICATIONS Directly wrap around an existing structure using an appropriate Zip-Clip locking device. Couple with fixing of choice to anchor to the ceiling material. Use carabiners to clip straight onto: Cable baskets. Cable trays. Pipe work brackets. Chilled beams. Radiant heat panels. Fan coil units. Retrofitted eye bolts. Acoustic boards. Use toggles to fix through: Light fittings. Cable trays. Plenum boxes. Radiant heat panels. Chilled beams. Speaker systems. AREAS FOR USE The Y-It system is designed for indoor applications. Regular galvanised systems should not be used in areas that have levels of corrosion or elevated levels of heat or moisture. For installations that are within corrosive areas consult with Zip-Clip Technical Department. INSTALLATION Attaching Carabiners to Cable Basket: Open gate of carabiner and hook around upright wire of cable basket. Repeat on opposite side of basket. Ensure angle of the inverted Y- shape is 60 degrees or less. Note: Fix carabiners directly opposite from each other to ensure fixture hangs level and always ensure snap gate has closed fully. Attaching Toggles to Through Holes: Note: Toggles should be placed into holes no larger than 12 mm diameter. Always ensure toggles are compatible with the through hole. Invert the toggle so it is parallel with the wire. Place the end-stop into the selected through-hole and then push the toggle into the hole –Toggle will naturally rotate 90 degrees to the wire to span the hole. Ensure toggles are located correctly and not overloaded. Repeat on opposite side of light fitting, cable tray, etc. Ensure angle of the inverted Y-shape is 60 degrees or less. If angle exceeds 60 degrees use a Y-It with a larger span. Attaching to Anchor Point Using Zip-Clip Locking Device: Pass the wire rope through the Zip-Clip device in the direction of the arrow. Pass wire rope through or around your required fixture/application and back through the Zip-Clip leaving 15 cm of wire protruding. Confirm engagement of the Zip-Clip on the wire by pushing the pin in the opposite direction to the arrows indicated.

Similar products


































Baltic Project Group SIA
Registration No.: 40002078769
VAT payer No.: LV40002078769
Legal address: Jelgavas street 28, Riga, LV-1004
Bank: Luminor Bank AS
SWIFT code: RIKOLV2X
Account: LV40RIKO0002013201329
Contact us
+371 29236283
Office
Mon.-Fri.: 9:00 - 18:00
Sat.-Sun.: Closed
Warehouse
Mon.-Fri.: 9:00 - 17:30
Sat.-Sun.: Closed
Baltic Project Group
Information
© 2025 Baltic Project Group SIA
Saved!
Go to shopping cart
To book a rental, please, go to the cart.
Go to shopping cart
Saved!
Out of stock
available on request
Go to shopping cart
Saved!
Go to project
Saved!
Go to catalogue
Thank you! Your request has been received!